    A supplier strong in engineering had not industrialised. We started with an assessment structured per the VDA 6.3 methodology, then brought in lean basics.

    Anonymised project. The client, its customer and the product are not named, and the case carries no figures.

    Client
    A supplier strong in engineering and product
    Its customer
    The customer that brought us in
    Our part
    An assessment, then lean and quality basics, package by package

    Situation

    The supplier was strong in engineering and in its product.

    It had not industrialised. Its processes were unstable, it had no standard work, and its readiness for series production was weak.

    How it started

    The customer brought us in through supplier development.

    The supplier hosted the work.

    What we looked at

    We started with an assessment structured per the VDA 6.3 methodology. It showed where the gaps were.

    • Processes that were not stable.
    • No standard work.
    • Weak readiness for series production.

    Work packages

    The basics came in as work packages, each with an owner, reviewed every week.

    Standard work

    Owner
    The supplier's team, led by us
    Scope
    Standard work for the production line.
    Closed when
    When the standard was in use on the line.

    5S and visual management

    Owner
    The supplier's team, led by us
    Scope
    Order at the workplace, and the status visible at a glance.
    Closed when
    When the practice held on the line.

    Control plan and PFMEA

    Owner
    The supplier's team, led by us
    Scope
    A control plan and a PFMEA for the line.
    Closed when
    When the practice worked on the line.

    How the work ran

    Every week
    A review of every work package.

    Exit criteria

    • The basics running without us.

    The customer decides on readiness for series production.

    What stayed with the client

    • The control plan.
    • Standard work.