Preskoči na sadržaj
    ← All services

    Under a CSL2 notice — or one customer escalation away from a line stop?

    Escalation Response — Controlled Shipping & Quality Wall

    Escalation response is third-party containment that protects your customer the moment a quality escape threatens their line. It covers Controlled Shipping Level 1 and 2 (CSL1/CSL2), a quality wall or firewall, GP-12 early-production containment and 0-km sorting — independent screening with OEM-format reporting until verified exit criteria let you stand down controlled shipping.

    Containment plan within 24 hours · mobilized worldwide · engagements scoped per project.

    When you need this

    • Your customer has issued a CSL1 or CSL2 (controlled shipping) notice.
    • A defect has escaped to the customer line and a 24–48h containment plan is demanded.
    • Repeat escapes have triggered a quality wall / firewall requirement.
    • A new or redesigned part needs GP-12 early-production containment.
    • Your internal team is stretched and cannot staff 100% screening on top of production.

    How it works

    1. 1

      Mobilize

      A containment plan is produced within 24 hours of engagement and screeners are deployed — on-site at your plant, at the customer, or at a third location — anywhere in the world.

    2. 2

      Define the criteria

      Defect definitions, boundary samples and an inspection instruction are agreed with the customer so every part is judged against the same standard.

    3. 3

      100% screen

      Visual, dimensional and functional screening of suspect stock with clear OK / NOK segregation, quarantine of rejects and full traceability.

    4. 4

      NOK flow & reporting

      Rejects are routed to rework or scrap, daily ppm and quantities are reported in the customer’s format, and 8D root-cause work runs in parallel.

    5. 5

      Facilitate exit

      Exit-criteria evidence is assembled and presented so controlled shipping can be lifted — and the permanent corrective action is verified to keep it lifted.

    Exit criteria

    Competitors stop at the screening. We define — and prove — the criteria that end the engagement, so it has a defensible finish line.

    • A defined number of consecutive clean shipments (typically agreed with the customer SQ team).
    • A closed 8D with verified root cause and effective permanent corrective action.
    • Updated control plan / PFMEA reflecting the corrective action.
    • Customer SQ sign-off on the exit package and removal of the CSL status.

    What we deliver

    • CSL1 Third-Party Inspection
    • CSL2 Controlled Shipping
    • Quality Wall / Firewall
    • GP-12 Early Production Containment
    • 0-km Sorting & Screening
    • 8D Root-Cause & Exit-Criteria Facilitation

    Frequently asked questions

    Software

    Run audits and 8D digitally — offline-first, AEI-guided.

    Qualiteh Audit

    Talk to an engineer who has solved this before

    Tell us what you are facing. We will map a realistic plan — and mobilize fast if the line is at risk.

    Discuss Escalation Response

    Your Privacy Matters

    We use cookies to analyze site usage and improve your experience. Your data helps us make Qualiteh better for everyone. Learn more